LG100 COMPACT – OPERATION AND TEST

LG100 – 120v/208-220 Operation & Test

1– Confirm that the power is not energized.

LG100-Step1
LG100 Step1

2- Connect the line side power and energize power. The LG100c will do a brief test and immediately supply the load side.

LG100-Step2
LG100 Step2

3- While unit has power. Perform a test by pressing and holding the TEST button  until “tES”  is displayed (Refer to Photo 3 &4). Unit must trip within 15 seconds. By doing this test you will be confirming the unit is working and disengaging the load side making it safe to connect a circuit. Notice- When the circuit has been interrupted, the display shows what the determining fault current in milliamps. This is extremely useful when trying to determine where and how dramatic the fault.

LG100 Step3
LG100 Step3

4- When test is complete the unit should have the green “Power on” indicator and the red “Circuit Tripped” illuminated. Now the user can safely make connections to the load side.

LG100 Step4
LG100 Step4

5- Once all connections are made to the load side and your devices are switch off, (remember a GFCI is not designed to be a switch) Press and hold the reset button until “rES” is displayed. The unit should reset and the circuit will energize.

LG100 Step5
LG100 Step5

LG100 Step6

Please click here for our Troubleshooting guide